
Comprehensive reform of offices, elliptical staircase area and corridor on the ground floor and renovation of all facilities. Renovation of finishes and coverings of the pavilion and pediment, replacement of LED luminaires and pediment networks. Comprehensive reform of the facilities, distribution and finishes of the annex building. External wall waterproofing located on Pedro Moreno Street and gym terrace. Waterproofing and replacement of polycarbonates of the roof of the pavilion and pediment. Replacement of interior and exterior carpentry and glass, in addition to the sectorization of the pavilion with carpentry and RF glass. Backed with all façade enclosures with thermal insulation on the inside. Waterproofing of the flat roofs of the main building and the annex building. Comprehensive renovation of the pool purification facility. Renovation of finishes on vertical and horizontal pediment walls, installation of curtains and pavilion baskets. Comprehensive renovation of the finishes of the gym and its facilities. Update and renovation of the existing electricity installation in all buildings. Renovation of finishes and facilities in the box office area. Installation of acoustic screens and their corresponding structures and accesses, in various areas of the roof, to minimize emissions from existing equipment. Manage services Manage suppliers

